Newly constructed SME unit (corner lot) built with black sandwich panels.
Well insulated in accordance with EPB regulations—fire class C.
Construction start: Q2 2025—completion: Q4 2026
1 sectional door 4x5 1 single solid swing door Signage area 1.20x42 roof penetrations utility connections up to the meter electrical distribution panel shared septic tank and rainwater tank (per 2 units) access to parking lot for charging station
Parking spaces available for purchase: 1